Eight stainless steel tanks were constructed as part of a new waste to energy plant in Wollert, a Melbourne suburb, which opened in 2017. The first of its kind in Australia, the 1 MW biogas facility will divert 33,000 tonnes of organic waste per year from traditional landfill, significantly reducing the burden on local landfills.